Electroplating equipment production lines occupy a large share in printed circuit board manufacturing enterprises. In order to ensure the normal operation of the electroplating equipment, the stability of the operation process and the service life of the electroplating equipment, the correct protection and maintenance of the equipment is very important. So, electroplating equipment manufacturers tell you why protection is important?

1. Protection and maintenance of the circulating system filter system 7d once check the filter element of the circulating system filter system to see if it leaks. Clean or replace the filter core every 10-15 days.

2. Protection of the linear plating line and protection of the linear plating line use brackets and expanders to transfer the substrate. Clean the crane and spanners once a week (do not remove the car and spanners), adhere to the clean appearance, clean with a rag, and sand with sandpaper.

3. Protection and maintenance of conveyors in horizontal electroplating production lines The conveying equipment used in horizontal electroplating production lines is the drum, which uses the rotation of the drum to continuously feed the circuit board into each slot. Therefore, the protection of the transport equipment of the horizontal hanging plating production line is different from that of the linear plating production line.

The drums of the horizontal plating line should be sorted once for 7 days to remove dirt adhering to the drums and ensure that the surface of the conveyor plate is clean. Check that the crankshaft is down.

4. The protection and maintenance of the vibration tissue on the linear electroplating production line should be carried out on the linear electroplating. In order to ensure the uniformity of the exterior copper and the effect of the hole copper during the copper plating process, the plate will vibrate and shake, and the tank will be set to vibrate and shake the structure. Check the reducer for 30 days to see if it works normally and check its tightness; Check the fastening of the bolts installed on the motor; Check the wear of anti-vibration rubber and replace it in time if it is serious. Check the contact of power cables in the 180d junction box. When the terminal is loose, tighten it immediately. For power cables with melted or aged insulation layers, replace the power cables to ensure insulation between them.

5. Protection and maintenance of other parts 7d. It is necessary to check the output power of the power supply twice; Check the heat dissipation devices and radiators commonly used in power supplies and electrical control devices, remove dust, and clean them to prevent heat dissipation. Check all connectors, timely repair poor contact, virtual connection and virtual welding, and timely replacement in case of corrosion damage; Check all contactors and relays. If the contact is poor or stuck, please replace it in time; Check the main parameters of capacitors, reactors, resistors and other parts. If abnormal, replace as soon as possible.

6. The main difference between the protection of the storage tank and the straight plating line and the horizontal plating line is that the method of transporting the circuit board is different. Tank protection and protection methods actually vary greatly. Within 7 days, each cleaning tank should be cleaned once, and the acid cleaning tank should be cleaned once, and then the tank liquid should be removed and replaced. Check whether the automatic water spraying device in the storage tank is blocked and pass the blockage immediately.

For the conductive support on the copper and tin plating solution and the contact between the anode and the induction power transmission line, wipe once with a towel and sandpaper. Check the titanium and tin baskets of the copper plating tank and tin plating tank, replace the rotten titanium basket bags and tin baskets, add the copper ball and tin rod, add the copper ball and tin rod after 7 days, electrolytic copper plating tank and electroplating tin bath.

主站蜘蛛池模板: 欧美精品3 | 久久国产精品视频 | 中文字幕人成无码人妻 | 午夜在线网站 | 中日韩一级露脸视频 | 热99精品视频 | 国产一区二区三区视频网站 | 国产aⅴ一区二区三区 | 国产精品不卡顿 | 亚洲天堂中文字幕在线 | 在线观看视频在线高清免费播放网站 | 综合久久久久久久青青 | 91干比| 探花在线观看 | 亚洲xxxxx | 国产亚洲精品久久久久久无挡照片 | 夜夜爱夜夜操 | 国产又粗又爽的视频 | 国产精品视频h | japanxxxx人女小hd | 国产小嫩模无套中出 | 国产亚洲欧美一区二区 | 无码精油按摩潮喷在播放 | 亚洲欧美国产一区二区三区 | AV无码久久久久不卡网站蜜桃 | 最近最好最新2019中文字幕免费 | 综合av在线 | 40岁成熟女人牲交片 | 色婷婷亚洲婷婷 | 亚洲av无码成h人动漫在线观看3d | 国产在线播| 青草综合 | xxxx69在线观看 | 午夜免费无码福利视频 | 桃色av网站 | 日本男女拍拍拍 | 亚洲无码久久久久久久 | 一区二区美女视频 | 999精品| 91在线综合 | 亚洲区中文字幕 |